2006 Sea Ray 32' (9.75 m) 320 Sundancer
Honolulu, Hawaii, United States
Change Order
There's nothing quite like the exhilarating profile of this sleek 320 Sundancer. Its dramatic lines and bold colors make everything else look like it's sitting still.
- Cruisers
- Power
- Used
- Gas/Petrol
- Fiberglass Hull
- HIN/IMO: SERT7780K506
$ 99,500 USD
€ 85,956 Euros
$ 138,289 CAD
£ 75,109 GBP
Description
Exciting features include cockpit wet bar with Corian counter, extra-wide bench-style helm seating with two flip-up thigh-rise bolsters, optional underwater swim platform lighting, premium cabin surround sound, and lots more.
Specifications
HIN/IMO: SERT7780K506
LOA: 35' 6'' (10.82 Meters)
Type: Power- Used
Year: 2006
Beam: 11' 5''
Draft Max: 3' 7''
Draft Min: 2' 9''
Heads: 1
Fuel Type: Gas/Petrol
Deadrise: 21
Hull Material: Fiberglass
Fuel Tank: 200 Gallons (757.08 Liters)
Fresh Water: 40 Gallons (151.42 Liters)
Holding Tank: 28 Gallons (105.99 Liters)
Photos click to view all
Engines
Engine 1
- Engine Make: MerCruiser
- Engine Model: MAG MPI
- Engine Type: Inboard
- Drive Type: Direct
- Power HP: 350.00
- Power KW: 261.00
- Fuel Type: Gas/Petrol
- Engine Location: Port
Engine 2
- Engine Make: MerCruiser
- Engine Model: MAG MPI
- Engine Type: Inboard
- Drive Type: Direct
- Power HP: 350.00
- Power KW: 261.00
- Fuel Type: Gas/Petrol
- Engine Location: Starboard
Full Details
Overview
Manufacturer Provided Description
There's nothing quite like the exhilarating profile of this sleek 320 Sundancer. Its dramatic lines and bold colors make everything else look like it's sitting still. Exciting features include cockpit wet bar with Corian counter, extra-wide bench-style helm seating with two flip-up thigh-rise bolsters, optional underwater swim platform lighting, premium cabin surround sound, and lots more.
Disclaimer
The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice.
Listing MLS by Yachtr.com
Contact Us
Honolulu Yacht Brokerage
24 Sand Island Access Road
Suite 19
Honolulu HI 96819 USA
Phone: 1-808-528-2628
Email: sales@hnlybi.com
Website: https://www.hnlybi.com
John Dukesherer
Yacht Broker
24 Sand Island Access Road
Suite 19
Honolulu HI 96819 USA
Office: 1-808-528-2628
Cell: 1-808-391-0433
Email: sales@hnlybi.com
WhatsApp: 1-808-391-0433





